The Bridge Holes between in the first phase of work on enhancement of its three arches. Since this morning in Tournai (Belgium), a crane mounted on a barge dismantle the building by dropping stones in a container. They will be in part reused for the reconstruction of the Bridge, which will begin the end of 2020.

” READ ALSO – Tournai is preparing to say goodbye to its medieval bridge is too narrow for the navigation.

This project intervenes in the framework of an update of the standards of navigation. Once the construction is completed, larger ships will be able to travel on the Scheldt, such as the barges-standard class Va (110 m x 11.4 m, with 7 meters of free height).

jobs directly from the Bridge Holes on the site of Notélé.be